Tunnel linking the two underground halls

4 m wide and 15.5 m long, connecting the Imam Al-Hussain underground hall to the Expansion underground hall.

Tunnel linking the two underground halls

About the project

A tunnel connecting the Imam Al-Hussain underground hall to the Expansion underground hall at the Al-Abbas Holy Shrine.

Challenges

Opening the tunnel meant cutting through a concrete wall and reinforced piles with a total thickness of 2.1 metres. Unconventional methods were used for the cutting, the excavation and the later stages of construction.

Project location

Al-Abbas Holy Shrine, Karbala